Map every test stage
Incoming, subassembly, firmware, calibration, functional, system, environmental, flight, data review, final acceptance, and customer-specific evidence.
CONSTRAINT GUIDE / TEST CAPACITY
Model equipment, fixtures, software, calibration, setup, failure analysis, retest, data review, staffing, and acceptance as one test production system.
Accepted output cannot exceed the complete test system's sustainable throughput. Equipment cycle, setup, calibration, software, fixtures, failure analysis, retest, data review, staffing, environmental limits, and release authority all consume test capacity.
PLANNING RELATIONSHIP / NOT A FORECAST
The relationship is intentionally simplified. Real planning must account for product mix, setup, calibration, maintenance, shared assets, environmental restrictions, retest, review, and release rules.
Incoming, subassembly, firmware, calibration, functional, system, environmental, flight, data review, final acceptance, and customer-specific evidence.
Include setup, changeover, queue, loading, automation, technician touch time, data transfer, review, failure analysis, retest, and release.
Track false failures, product defects, fixture issues, software issues, calibration escapes, retest loops, and investigation load.
Clarify what record establishes pass, who reviews it, what blocks release, and how exceptions are controlled.
TEST CAPACITY CHECK
| Question | Evidence | Why it matters |
|---|---|---|
| Which test step limits accepted output? | Queue, utilization, effective cycle, and release data by step | The most visible equipment may not be the system constraint |
| What drives retest? | Failure modes, false-failure rate, repair loop, and re-entry point | Retest can consume more capacity than initial test |
| What is shared? | Fixture, chamber, range, software, technician, reviewer, and calibration calendars | Shared resources create hidden coupling across products |
| Can the test basis replicate? | Released procedure, configuration, fixtures, software, data, training, and authority | A second station without control may not produce equivalent evidence |